A data centre is a secure building that houses the fundamental technology needed to store, process and move digital information.
Inside a data centre you will usually find servers (computers), network connections, power and cooling systems, backup equipment, security systems and monitoring tools.
Data centres keep digital services running. Every time you visit a website, stream a programme, post on social media, pay with your phone, check a map, join a video call, access the Internet or use online banking, a data centre underpins and enables that action.
We need data centres because modern life depends on digital services.
They support everyday activities like:
A data centre is the physical infrastructure that facilitates the digital world. It may not be as visible as roads, railways, phone masts or power lines, but it plays a similar role in enabling everyday services work.
A data centre usually includes:
These systems work together to keep digital services secure, reliable and running twenty four hours a day, seven days a week.
Data centres facilitate the digital services people use every day.
They help make it possible to:
Most people use data centres many times a day without seeing it.
Modern data centres should not affect your household water pressure.
Older information online often refers to data centres in hotter parts of the world, where some facilities historically used large volumes of water for evaporative cooling.
The UK has a cooler climate, so data centres here generally require less cooling than facilities in very hot locations.
Many newer UK data centres use closed-loop or waterless cooling systems. A closed-loop system works more like a car radiator: liquid moves around the system to transfer heat, but it is not continuously taking water from the public supply.
Where site-specific information is available, the site should explain exactly what cooling system is being used and how much water is expected to be required.
Some data centres use water, but modern UK facilities often use much less than people assume.
The amount depends on the cooling system, the site design, the climate and the type of data centre. Some newer sites use waterless cooling. Others use closed-loop systems where water or liquid is retained within the system rather than constantly drawn from the public supply.
For context, a techUK report based on 73 commercial data centre sites in England found that just over half used waterless cooling, and almost two-thirds used less than 10,000 cubic metres of water a year — less than a typical leisure centre.
Another study of an AI data centre in England found that it uses the same amount of water in a 20-year period as an average family of four does in a single year. That’s just 5%!
The right question is not simply “do data centres use water?” but “how does this specific site use water, how much does it use, and how is that managed?”
Data centres do use electricity. That should be explained honestly.
The important context is that data centre power is wholesale, commercial power, planned and purchased through arrangements with energy providers.
It is not taken from neighbouring homes, and it does not mean local households are directly sharing their domestic supply.
Across Great Britain, official estimates put operational data centre electricity consumption at around 4.5 terawatt-hours in 2024, about 2% of electricity consumed from the grid.
That makes data centres a significant electricity user, but not the largest source of electricity demand in the country.
Water use is different. Many modern UK commercial data centres use little or no water for cooling.
A techUK report found that most of the commercial data centres surveyed used less water than many people expect, with 64% using less than 10,000 cubic metres per year — less than a typical leisure centre.
The simplest way to explain it is:
For any local data centre, the best answer should always be based on the site’s own energy and water figures.
A UK data centre should never directly affect the electricity bill of neighbouring homes.
Data centres buy commercial power through agreements with energy providers. Their electricity supply is planned separately from domestic household supplies.
That means the electricity used by a data centre will not be drawn from nearby homes.
Electricity prices are affected by many wider factors, including wholesale energy markets, generation costs, network investment, policy costs and supplier pricing. A local data centre is not the same as a household customer using more electricity on your street.
Where local grid upgrades are needed, the site should explain what is being built, who is paying for it and how the connection is managed.
Data centres need power because servers (computers), networks, cooling, security and monitoring systems have to operate continuously.
The digital services they support are expected to be available all the time, so they need power all the time. People do not expect their banking app, hospital systems, cloud files, maps or payment services to stop working or be inaccessible at the point of use.
That requires 24/7 electricity, backup power systems and careful management.
The industry is also working to improve efficiency, including better cooling, more efficient equipment, smarter design and the use of renewable or low-carbon energy where available.
During construction, there can be noise from demolition, groundworks, vehicles, equipment and building activity. That is one of the most noticeable impacts for local people and should be explained clearly.
Once a data centre is built and operating, it is usually much quieter than many heavy industrial uses. There may still be some noise from cooling systems, maintenance, vehicles or generator testing, but this should always be controlled and monitored.
The answer will depend on the site, equipment, distance from homes, noise limits and the mitigation processes in place.
Like all construction projects, the site should explain construction noise and operational noise separately, because they are very different issues.
Data centres are complex buildings. A lot of work has to happen before they can open.
This may include:
Sometimes it can look like nothing is happening on a site, even when important preparation work is underway.
Every site is different. Some sites need more preparation because power, ground conditions or local infrastructure are more complex.
Backup generators are there to keep the data centre running if there is a power cut or wider grid issue.
They are part of the resilience system. They are not normally used as the day-to-day power source for the data centre.
Generators need to be tested regularly to make sure they will work in an emergency. Those tests should be planned and managed to reduce disruption.
Where site-specific information is available, the site should explain what fuel is used, how often testing happens, how long tests last and how noise or emissions are controlled.
If there is a power cut, the data centre’s backup power systems are designed to keep its equipment running.
Backup systems can take over automatically while the main power supply is restored.
This helps protect the digital services that rely on the data centre. It also means the data centre is not dependent on the same kind of interruption that might affect a normal building or home.
Power cuts are relatively rare in the UK, so generators are only there for emergency backup.
There may be more traffic during construction, including construction vehicles, deliveries and site workers.
That is usually temporary and should be managed through a construction traffic plan.
Once a data centre is operating, it typically has fewer daily visitors than many other commercial or industrial uses. It does not usually generate the same kind of traffic as a retail park, supermarket, train station, warehouse or leisure venue.
The site should explain expected construction traffic, access routes and what happens once the data centre is operational.
Data centres are often built on former industrial or brownfield sites because those locations may already have access to power, connectivity, roads and other infrastructure which can be redeveloped.
Using previously developed land can also reduce the need to build on greenfield land like fields.
However, brownfield sites will still need clearance, groundworks or remediation before construction can begin.
The right answer depends on the specific site and its planning history.
Data centres are designed to be secure and carefully managed and are as important as water or energy systems.
They include physical security, controlled access, fire detection, monitoring, backup power, cooling and operational procedures.
The purpose of these systems is to protect the building, the equipment and the services that rely on it.
A data centre is not open to the public in the same way as a shop or office because it supports important infrastructure and needs to remain secure.
Data centres can create jobs during construction and operation.
During construction, they may support roles in groundworks, engineering, electrical installation, project management, security, logistics and specialist trades.
Once operational, a data centre may support jobs in engineering, facilities management, security, operations, maintenance, cleaning, administration and technical support.
There may also be local supply-chain opportunities.
The number and type of jobs varies by site, so any local claim should be based on confirmed figures.
Data centres have an environmental impact because they use energy, materials, land and infrastructure.
The important question is how that impact is managed.
Modern data centres are increasingly designed around energy efficiency, responsible cooling, renewable or renewable energy procurement, careful site selection, biodiversity measures, heat reuse opportunities and long-term operational efficiency.
A data centre should never pretend there is no impact. It should explain what the impact is, what is being done to reduce it and ensure information is available for each location.
Data centres need access to power, fibre connectivity, transport routes and skilled people. Sometimes, that means they are built in or near existing towns, cities, industrial areas or business districts.
They are usually not built “in someone’s back garden”. More often, they are located on commercial, industrial or previously developed land.
The concern is understandable because these buildings are large and unfamiliar. That is why local information, construction updates and clear answers are important.
This site is designed to give clear, plain-English answers to common questions about data centres.
Where possible, answers should be based on:
Some answers vary by site. Where that is the case, the site should say so clearly.
The aim is not to avoid difficult questions. The aim is to answer them properly.